Project · Glendale
Hall Bathroom Remodel in Glendale
The tub surround and floor were past saving, so we took the room down to the studs and subfloor and rebuilt it.
- New tub
- Porcelain to the ceiling
- Sliding glass door
- Matte black fixtures

What we did
New tub, large-format marble-look porcelain from the tub to the ceiling, a frameless sliding glass door and matte black shower fixtures. The same porcelain runs across the floor, set with a leveling system so the big tiles sit flat. A new vanity with a white top, a round black mirror, a vanity light and a new toilet finish the room. Glendale has its own Building & Safety department, separate from LADBS, and we handle the permit when the scope needs one.






Full project story on buildforfamilies.com.
Bathroom in Glendale or Burbank?
Free walkthrough and written estimate.
Get a free estimateCall (747) 257-5457